Case Studies

Find out about some of the key projects we've been working on with our overview case studies. Download them here.


Planetary Cabler

DPS Group were engaged to provide a turnkey solution to design, build and maintain a Planetary Cabler for Oceaneering.



DCS Upgrade

Scotland’s largest Power Station required a full upgrade of it’s Distributed Control System (DCS).